Clean energy, built for scale

From pilots to industrial capacity, Greenlyte is the catalyst for resilient energy systems that deliver carbon-neutral, cost-competitive clean fuels.

Applications

Our project pipeline

Current tab name

1

IN PLANNING

2

IN PRODUCTION

3

OPERATIONS
STARTED

4

CONSISTENT
OPERATION RUNNING

Use case

LiquidSolar GigaSAF

Scaling Liquid Solar to industrial reality – building Greenlyte’s first gigawatt-class eSAF plant from air, water, and renewable power.

Project

Amet minim mollit non deserunt ullamco est sit aliqua dolor do amet sint. Velit officia consequat duis enim velit mollit. Exercitation veniam consequat sunt nostrud velit.

MAIN FACTS & FIGURES

Approx. 400 kt of CO₂ / year

Plant capacity (in CO₂ / year)

100 kt of eSAF(approx. 100 kt of eSAF)

Produced final product

TBD

Location

2030

Planned year of deployment

1

IN PLANNING

2

IN PRODUCTION

3

OPERATIONS
STARTED

4

CONSISTENT
OPERATION RUNNING

Use case

LiquidSolar Methanol

Powering shipping and chemistry with air – modular DAC and hydrogen systems delivering renewable e-methanol at scale.

Project

Amet minim mollit non deserunt ullamco est sit aliqua dolor do amet sint. Velit officia consequat duis enim velit mollit. Exercitation veniam consequat sunt nostrud velit.

MAIN FACTS & FIGURES

Up to 1,400 tons of CO₂ / year

Plant capacity (in CO₂ / year)

Up to 1.000 tons of eMethanol / year

Produced final product

Marl, Germany

Location

2026/2027

Planned year of deployment

PARTNERS

PUBLIC FUNDING INSTITUTIONS

1

IN PLANNING

2

IN PRODUCTION

3

OPERATIONS
STARTED

4

CONSISTENT
OPERATION RUNNING

Use case

LiquidSolar SAF

Pioneering direct air-to-jet fuel at Düsseldorf Airport – bringing Liquid Solar SAF production to where the demand takes off.

Project

Amet minim mollit non deserunt ullamco est sit aliqua dolor do amet sint. Velit officia consequat duis enim velit mollit. Exercitation veniam consequat sunt nostrud velit.

MAIN FACTS & FIGURES

1,200 tons of CO₂ / year

Plant capacity (in CO₂ / year)

250 tons eSAF / year

Produced final product

Düsseldorf, Germany

Location

2027/2028

Planned year of deployment

PARTNERS

1

IN PLANNING

2

IN PRODUCTION

3

OPERATIONS
STARTED

4

CONSISTENT
OPERATION RUNNING

Use case

LiquidSolar SNG

Turning air into synthetic natural gas — coupling DAC and green hydrogen for scalable, renewable gas production.

Project

Amet minim mollit non deserunt ullamco est sit aliqua dolor do amet sint. Velit officia consequat duis enim velit mollit. Exercitation veniam consequat sunt nostrud velit.

MAIN FACTS & FIGURES

40 tons of CO₂ / year

Plant capacity (in CO₂ / year)

5 tons SNG / year

Produced final product

Duisburg, Germany

Location

2025/2026

Planned year of deployment

PARTNERS

PUBLIC FUNDING INSTITUTIONS

Use case

LiquidSolar DAC

Unleashing fully integrated DAC with autonomous carbon absorption-desorption – setting the new baseline for scalable, affordable carbon capture.

Project

Amet minim mollit non deserunt ullamco est sit aliqua dolor do amet sint. Velit officia consequat duis enim velit mollit. Exercitation veniam consequat sunt nostrud velit.

MAIN FACTS & FIGURES

5 tons of CO2 / year

CO₂ Captural

Carbon & Hydrogen

Produced final product

Essen, Germany

Location

2024/2025

Planned year of deployment

PUBLIC FUNDING INSTITUTIONS

Our partners

From lab to industry

Our upscaling story

March 2025

LiquidSolar DAC:
First integrated CO2 absorption & desorption prototype at pilot scale (TRL 6)

March 2025

LiquidSolar Methanol:
Grant for FOAK-plant secured

November 2025

LiquidSolar SNG:
Plant operational (TRL 7)

Mid 2027

LiquidSolar Methanol:
Plant operational (TRL8)

2028

LiquidSolar Defense:
Project operational

2028

LiquidSolar SAF:
Plant operational

2030

LiquidSolar GigaSAF:
Plant operational

November 2022

Bench-scale validation of DAC-process (TRL 3)

May 2023

Small-scale system and component testing (TRL 4)

November 2023

Germany’s first 100t/a CO2 absorption demonstrator (TRL 5)

August 2024

Upscaled CO2 desorption prototype for multi-stack operation (TRL 5)

March 2025

March 2025

November 2025

Mid 2027

2028

2028

2030

November 2022

May 2023

November 2023

August 2024

OUR ADVANTAGE

The platform behind clean fuel production

30% lower energy costs

Electrochemical capture runs on direct current from wind and solar. No heat. No combustion. No toxic solvents.

50% lower system costs

Integrated CO₂ and H₂ production minimizes capital and operational expenses.

Fuel-ready outputs

99% pure carbon and hydrogen, delivered at tunable ratios or as direct syngas, ready for immediate use in synthesis processes.

Impact

Liquid Solar in action

Lorem ipsum

$1-4M

Lorem ipsum

$1-2B

Lorem ipsum

$1-4M

Lorem ipsum

50–100%

Lorem ipsum

$1-4M

Lorem ipsum

$1-4M

PARTNER WITH US

Get in touch to experience Liquid Solar.

Submit

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.